Monday, April 16, 2012

Tree Fail

We are starting our latest bungalow style home at 1316 Washington Avenue in Fairmount. Our slab is set and we are pouring this Wednesday. The home will be a great addition to the neighborhood.

Onto My Fail:

There were two small beautiful trees on this lot, and I wasn't about to have them simply dozed. Complex and careful arrangements were made to transplant the trees. After much coordination between multiple subcontractors, we went about getting the job done. The trees did not cooperate. The soil was so hard that hand digging was impossible for the size root balls we wanted, so a tractor was needed. Then, the once hard soil crumbled away from the root balls we excavated, and the roots were exposed. We slowly started losing the trees. Three more days of efforts by 3-4 men, one mini excavator, one skid steer loader, and one frustrated me. We wrapped the root balls in wire and poly. We set a day to transport them, and the rain delayed us two days. Then the invoices started rolling in. A hundred here, a hundred there, and a rental invoice for $200. And there the trees sat dying two feet away from their original home.

Day 5: My landscaper, two labors and I looked down on the trees this morning. I reluctantly admitted defeat upon my landscaper's estimation of a 20% chance they would survive. I told him I didn't want to sink another dime into this. I tried, so help me I tried.

As he walked away from me, I looked down at the sad little trees. I was sulking. Johnny (my landscaper) paused from his truck door, turned and yelled, "If you like those trees, I can get them the same size for about 90 bucks."

Saturday, April 14, 2012

622 Hemphill Framed

I am more than impressed with the progress of my framers on 622 Hemphill. This was just a slab Wednesday at 1:00. This picture was taken at 5:00 today. My frame crew is fantastic. We should see sheathing and decking this next week, and brick in the two weeks.

9208 Ravenswood Progress

Our Pecan Plantation home has made some quick progress over the last couple weeks. We are framed, and mechanical, electrical, and plumbing are complete. We are ready for the security system and then onto foam insulation. I can't wait to post pictures of the interior when we are a little further along.

Sunday, April 8, 2012

622 Hemphill Slab Poured

Our latest Mixed Use Building at 622 Hemphill has it's foundation in place, and we're ready to start framing this week. I am excited to see this one taking shape.

Friday, March 30, 2012

9208 Ravenswood Goes Vertical!

Framing has begun on our Pecan Plantation home. The greatness of this plan can only be captured when you walk in the front door (or what will be the front door.) There is no way to describe the home other than grand!

Second floor framing is in progress. I will post updates as we go....


622 Hemphill

Our 3rd generation mixed use building is breaking ground! Forms are set and piers and in place. The plan is to be framing in the next 10-12 days. I am so proud to be getting this one going.

We will be offering office space on the ground floor with two 1000 plus square foot apartments on the second floor. I hope to have a rendering soon,

Wednesday, March 14, 2012

Pecan Plantation Home Gets Piers!

I have to post some kind of progress on something. I know piers aren't that exciting, but when you have four projects locked up in different stages of municipal red tape, then you take what you can get and see it as a baby step in the right direction. 

This is the beginning of a beautiful riverfront home overlooking a tree lined hillside. I am jealous of the owner. This home is going to be great.